Building Permit Document Checklist

For building permits – Required as applicable
  1. Completed Permit application.
  2. Proof of Ownership of the property
  3. Site plan showing the existing buildings, proposed building (with its square footage, and height) and the distances to each property line. Site Plan must show:  Site Plan Approval from Tooele County Fire Department, Direction of North, Lot lines, adjacent streets, roads, rights-of-way, easements, Location of all existing structures, wells, and septic tanks on the site, Location of proposed construction and improvements, and vehicle access such as driveway with its width.
  4. Engineered Construction Plans
  5. Engineered Structural Calculations
  6. Proof of Compliance with Energy Code (Insulation information) such as ResCheck / ComCheck
  7. Gas pipe plan showing pipe sized, distances, and BTUs of equipment.
  8. Manufacturers installation instructions / manuals / specifications.
  9. Contractor’s Information
  10. Owner Builder Form
  11. Fire Department Approval
  12. Utility approval Gas, Electric, Sewer, Water (required if new service or additional load being added)
  13. Water Service Approval
  14. Sewer / Septic system approval
  15. Zoning (City) approval
  16. Architectural Control Committee (ACC) approval

Required Inspections

The person doing the work is responsible for calling for the inspection and knowing what work shall be done and that it is ready for the requested inspection. Twenty-four (24) hours advanced notice is required and then the inspection will be scheduled at the soonest available time. Inspections cannot be scheduled without reporting the following information:  The building permit number and the site address.
THE FOLLOWING INSPECTIONS MUST BE COMPLETED:
  1. FOOTING INSPECTION Call for prior to pouring concrete.
  2. FOUNDATION INSPECTION Call for prior to pouring concrete.
  3. UNDERGROUND ROUGH PLUMBING, CONCRETE SLAB OR UNDER-FLOOR INSPECTION After piping, conduit, ducts, moisture vapor retarder, foundation waterproofing and damp proofing, etc. are in place, but before pouring concrete floor.
  4. SEWER LATERAL & WATER LATERAL INSPECTION Apply test and call prior to backfilling.
  5. FRAMING (4-WAY) INSPECTION Call for after roof, all framing, fire blocking and bracing are in place; all pipes, chimneys and vents are complete; and the rough electrical, plumbing, mechanical are in.
  6. INSULATION INSPECTION Call for after floor, wall and ceiling are installed. (Ceiling may be inspected at final for blow-in insulation).
  7. SHOWER PAN INSPECTION – for showers that build-up type showers (as applicable)
  8. WEATHER BARRIER Call for prior to exterior veneer being installed.
  9. FINAL INSPECTION Call for after finish grading and the building are completed and ready for occupancy.
NOTE:  Other inspections may be required by the Building Official.