435-849-2651
planning@lakepoint.gov

Waste Disposal Contact

801-725-5096

City Offices Phone

info@lakepoint.gov

City Offices Email

Building Permit Document Checklist

For building permits – Required as applicable
  1. Completed Permit application.
  2. Sewer Connection Approval letter from Lake Point Improvement District- On all new Residential builds requiring a connection to Sewer (Lake Point Improvement District), the permit will not be reviewed until the approval letter is submitted with the application.
  3. Proof of Ownership of the property
  4. Site plan showing the existing buildings, proposed building (with its square footage, and height) and the distances to each property line. Site Plan must show:  Site Plan Approval from Tooele County Fire Department, Direction of North, Lot lines, adjacent streets, roads, rights-of-way, easements, Location of all existing structures, wells, and septic tanks on the site, Location of proposed construction and improvements, and vehicle access such as driveway with its width.
  5. Engineered Construction Plans
  6. Engineered Structural Calculations
  7. Proof of Compliance with Energy Code (Insulation information) such as ResCheck / ComCheck
  8. Gas pipe plan showing pipe sized, distances, and BTUs of equipment.
  9. Manufacturers installation instructions / manuals / specifications.
  10. Contractor’s Information
  11. Owner Builder Form
  12. Fire Department Approval
  13. Utility approval Gas, Electric, Sewer, Water (required if new service or additional load being added)
  14. Water Service Approval
  15. Sewer / Septic system approval
  16. Zoning (City) approval
  17. Architectural Control Committee (ACC) approval
  18. If you are an owner/builder (not a contractor) you must fill out an Owner Builder Affidavit

Required Inspections

The person doing the work is responsible for calling for the inspection and knowing what work shall be done and that it is ready for the requested inspection. Twenty-four (24) hours advanced notice is required and then the inspection will be scheduled at the soonest available time. Inspections cannot be scheduled without reporting the following information:  The building permit number and the site address.
THE FOLLOWING INSPECTIONS MUST BE COMPLETED:
  1. FOOTING INSPECTION Call for prior to pouring concrete.
  2. FOUNDATION INSPECTION Call for prior to pouring concrete.
  3. UNDERGROUND ROUGH PLUMBING, CONCRETE SLAB OR UNDER-FLOOR INSPECTION After piping, conduit, ducts, moisture vapor retarder, foundation waterproofing and damp proofing, etc. are in place, but before pouring concrete floor.
  4. SEWER LATERAL & WATER LATERAL INSPECTION Apply test and call prior to backfilling.
  5. FRAMING (4-WAY) INSPECTION Call for after roof, all framing, fire blocking and bracing are in place; all pipes, chimneys and vents are complete; and the rough electrical, plumbing, mechanical are in.
  6. INSULATION INSPECTION Call for after floor, wall and ceiling are installed. (Ceiling may be inspected at final for blow-in insulation).
  7. SHOWER PAN INSPECTION – for showers that build-up type showers (as applicable)
  8. WEATHER BARRIER Call for prior to exterior veneer being installed.
  9. FINAL INSPECTION Call for after finish grading and the building are completed and ready for occupancy.
NOTE:  Other inspections may be required by the Building Official.

For Residential building permits Commission Secretary

Building Inspector Scheduling

Contact Jamie for everything else
other than building permits